Our HPC Resources - Resource Details

If you wish to include this type of resource in a cost calculation, choose it in the for the Comet facility to model costs for this resource type.

Note: You must be logged in to access the costing tool.

Technical Specifications
FacilityComet
Facility StatusPlanning
Node TypeGPU-S
Node Quantity4
RAM768 GBytes
CPU2x CPU : AMD EPYC 9745 (x86_64)
GPU8x GPU Type : Nvidia L40S 48GB
Reserved25% for unfunded use
Reserved75% for funded use
CPU VendorAMD
CPU ModelEPYC 9745
CPU Architecturex86_64
CPU Cores128
CPU Threads256
Base Frequency2400MHz
Turbo Frequency3700MHz
Cache (L1)6144 KBytes
Cache (L2)131072 KBytes
Cache (L3)256 MBytes
GPU VendorNvidia
GPU ModelL40S
GPU RAM48 GBytes
GPU Speed864 GBytes/Sec
CUDA Support8.9
CUDA Cores18176
Speed (FP64)0.0 GFLOPS
Speed (FP32)91610.0 GFLOPS
Speed (FP16)91610.0 GFLOPS
General Description

Standard GPU node as found in the Comet HPC facility. These nodes have the same general compute performance as non-GPU nodes, but are fitted with multiple GPU cards for accelerated compute.

These nodes are also connected by low-latency, high speed, 200gbit/sec Infiniband.

It should be noted that the L40S cards are optimised for FP32 and FP16 compute - if your code utilises 64bit floating point, then performance on these cards may be sub-optimal. Consider the use of the larger GPU-L nodes with H100 cards if 64bit performance of your GPU code is essential.

Available Compute Resources

All registered users of the Comet facility may access any of the hours of compute available in the unfunded queues, as listed below. However, your jobs may need to wait longer to run due to the number of resources available. Consider building in costing for your research activity or project for dedicated HPC resources to enable access to the larger pool of resources dedicated for funded queues.

GPU Resources - Unfunded Projects

The maximum hours of GPU compute available across all users of unfunded queues is:
(4 Nodes) x (8 Cards) x (730 Hours/Month) x (25%) = 5840.0 GPU Compute Hours/Month

GPU Resources - Funded Projects

The maximum hours of GPU compute available across all users of funded queues is:
(4 Nodes) x (8 Cards) x (730 Hours/Month) x (75%) = 17520.0 GPU Compute Hours/Month

You can use the for the Comet facility to model the potential contributions towards accessing these resources.

Note: You must be logged in to access the costing tool.